Maintenance:
The concrete surface can be cleaned with mild soap and water. No citrus or vinegar-based products should be used. Organic does not always mean “mild” and can include citrus ingredients that you’ll want to avoid.
Dry Time
Typical drying time is 4-6 hours at 70°F and 50% relative humidity. Cooler temperatures or higher relative humidity can extend the drying time. Treated surfaces will be ready for pedestrian and vehicle traffic within 24 hours.
Clean Up
Clean equipment and tools with soap and water. Unused or old material may be disposed of in a waste disposal site in accordance with local, state and federal laws.
Precautions/Safety
Avoid contact with skin, eyes and clothing, do not take internally. Use appropriate safety equipment during application and handling. Please refer to the safety data sheet (SDS) for additional precautionary instructions before use.
Best Performance
- Proper application is the responsibility of the user.
- Make sure the most current versions of technical data sheetsand safety data sheets are being used.
- Do not use in immersion service or constant chemical exposure areas.
Coverage
1 coat: 60 square feet per 16 oz. 2 coats: 30 square feet per 16 oz. Variations in texture and porosity of substrate will affect the coverage and performance of the product.